Tunnel Boring Machine (TBM) Transfer Shuttles

0
151

SMP have recently been contracted to build TBM Personnel Transfer Shuttles for a major tunnelling project.

Transfer Shuttles are used for transferring compressed air workers/divers from the air locks of the TBM to the main decompression complex. The Shuttle is designed to accommodate 2 men in the entry lock and 6 men in the main lock.

The Life Support System is designed to provide two (2) hours of life support when it is disconnected from the TBM or decompression complex. The chamber is installed in a crash proof exostructure with interconnecting chamber mating clamp mounted on the end of the structure. These units are mounted on wheels so that they can be transported easily during a working transit period.

CHAMBER EQUIPMENT OVERVIEW

0-10 Bar/MSW Gauges & 0-2.4 Bar/MSW Therapeutic Gauge
0-400 Bar HP Gauges & 0-30 Bar LP Gauges
Communications Radio & Sound Powered Phone
Oxygen & Carbon Dioxide Analyzer with Flow Meter with High and Low Sample
Vessel Over Pressure Relief Valves
Suitable Service Control Valves
Tungum Pipe Work
Oxygen Overboard Dump Masks
BIBS – Oxygen & Mixed Gas Connections
CO2 Scrubbers
Temperature & Humidity Hygrometer
Habitat Conditioning Unit (Cooling)
Hyperbaric Mattresses
BIBS Exhaust Back Pressure Regulator Assemblies
Chamber Internal CCTV Monitoring
Hyperbaric LED Lights
Hyperbaric Fire Extinguishers
Water Mist Fire Suppression System

For full specifications or to discuss your requirements: –
Call +44(0)1772 687775 or email [email protected]

 

 

Source

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.