Subsea 7’s Seven Rio Begins Sea Trials

0
336

Subsea 7’s Seven Rio left the Huisman Schiedam quayside for her sea trials, after the installation of a 550mt Pipelay Tower.

The company informed through their social media that the vessel will return to Huisman Schiedam in early August for the finalization of the Huisman scope of work.

In November last year, IHC successfully launched the pipelaying vessel at its shipyard in Krimpen aan den IJssel, The Netherlands.

The Seven Rio has an overall length of 146 metres, a beam of 30 metres and a Class-2 dynamic positioning system.

The vessel is equipped with a vertical (tiltable) lay system – with a 550t top tension capacity – and twin ROVs.

She is fitted with two under-deck storage carousels, with a capacity for 2,500t and 1,500t of product respectively.

 

 

 

 

Source

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.