Aker Solutions has secured a contract from Statoil for a concept study for the Low Well Production project (LWP) on Åsgard A platform, the Norwegian oil services company said on Friday.
The aim of the LWP is to accommodate Åsgard A for future production with lower well pressure.
The contract includes further options for FEED and EPCI for the LWP project.
In addition to this contract, Statoil has awarded Aker Solutions a contract for the topside Front end Engineering Design (FEED) for Trestakk field tie-in to the existing Åsgard A platform.
The contract also includes an option for further EPCI work.
The Trestakk field is located approximately 27 km southeast of Åsgard A platform.